Quality and HSE

Quality Management

Quality control begins with contract and capability review and continues through engineering, procurement, material receipt, fabrication, inspection, coating, packing, dispatch and final handover.

Project Quality Planning

Depending on the project, LSI quality planning may include:

  • Project Quality Plan
  • Inspection and Test Plan
  • Approved procedures
  • Method statements
  • Inspection checklists
  • Hold and witness points
  • Client and third-party inspection requirements
  • Quality-record requirements
  • Final dossier index

Material Control and Traceability

Controls may include:

  • Material receiving inspection
  • Material certificate verification
  • Heat-number traceability
  • Material-grade confirmation
  • Identification and marking
  • Storage and preservation
  • Issue and return records
  • Nonconforming-material segregation
  • Material reconciliation

Welding Quality Control

Welding controls may include:

  • Welding procedure qualification
  • Welding procedure specifications
  • Welder qualification verification
  • Welding-consumable control
  • Joint identification
  • Fit-up inspection
  • Welding traceability
  • Visual inspection
  • NDT coordination
  • Weld-repair control
  • Reinspection
  • Final acceptance records

Coating Quality Control

Coating controls may include:

  • Coating-system verification
  • Surface-cleanliness inspection
  • Surface-profile measurement
  • Dust testing
  • Soluble-salt testing
  • Environmental monitoring
  • Paint-batch control
  • Wet-film thickness checks
  • Dry-film thickness inspection
  • Holiday testing where applicable
  • Repair and touch-up inspection
  • Final coating release

Inspection and Final Documentation

Final quality activities can include:

  • Dimensional inspection
  • Mechanical-clearance records
  • Testing records
  • Calibration verification
  • Nonconformance closure
  • Punch-list clearance
  • Final inspection
  • Packing-list verification
  • Dispatch clearance
  • Quality dossier preparation
  • Client and third-party sign-off

Health, Safety and Environment

LSI is committed to preventing injury, occupational ill health, property damage and environmental harm.

Our HSE approach includes:

  • Hazard identification and risk assessment
  • Project-specific HSE planning
  • Method statements
  • Permit-to-work compliance
  • Daily toolbox talks
  • Competency and training controls
  • PPE requirements
  • Lifting and rigging controls
  • Equipment inspections
  • Vehicle inspections
  • Work-at-height controls
  • Hot-work controls
  • Confined-space controls
  • Electrical safety
  • Emergency preparedness
  • Incident and near-miss reporting
  • Corrective-action management
  • Site inspections
  • HSE audits
  • Stop-work responsibility
  • Waste-management controls
  • Spill prevention and response
  • Chemical and coating-material controls
  • Continual performance improvement

Safety requirements are incorporated into planning, mobilization, execution, supervision and closeout.

View Our Certifications
ISO Certified 9001:2015
ISO Certified 14001:2015
ISO Certified 45001:2018

Planning an Industrial Work Package?

Send us your drawings, specifications, bill of quantities, project location, required delivery date and inspection requirements. LSI will review your enquiry and provide a practical technical and commercial response.

Tell Us About Your Requirement

Submit your project information and our team will coordinate the appropriate technical and commercial review.

Drawings, specifications, bills of quantities and other attachments can be emailed to info@lsiksa.com quoting the project name above.

Contact our team

Let Us Discuss
Your Project

5371 Al Dammam–Al Jubail Highway Road

Al Jubail, Kingdom of Saudi Arabia

info@lsiksa.com

+966 13 838 3130