Quality and HSE
Quality Management
Quality control begins with contract and capability review and continues through engineering, procurement, material receipt, fabrication, inspection, coating, packing, dispatch and final handover.
Project Quality Planning
Depending on the project, LSI quality planning may include:
- Project Quality Plan
- Inspection and Test Plan
- Approved procedures
- Method statements
- Inspection checklists
- Hold and witness points
- Client and third-party inspection requirements
- Quality-record requirements
- Final dossier index
Material Control and Traceability
Controls may include:
- Material receiving inspection
- Material certificate verification
- Heat-number traceability
- Material-grade confirmation
- Identification and marking
- Storage and preservation
- Issue and return records
- Nonconforming-material segregation
- Material reconciliation
Welding Quality Control
Welding controls may include:
- Welding procedure qualification
- Welding procedure specifications
- Welder qualification verification
- Welding-consumable control
- Joint identification
- Fit-up inspection
- Welding traceability
- Visual inspection
- NDT coordination
- Weld-repair control
- Reinspection
- Final acceptance records
Coating Quality Control
Coating controls may include:
- Coating-system verification
- Surface-cleanliness inspection
- Surface-profile measurement
- Dust testing
- Soluble-salt testing
- Environmental monitoring
- Paint-batch control
- Wet-film thickness checks
- Dry-film thickness inspection
- Holiday testing where applicable
- Repair and touch-up inspection
- Final coating release
Inspection and Final Documentation
Final quality activities can include:
- Dimensional inspection
- Mechanical-clearance records
- Testing records
- Calibration verification
- Nonconformance closure
- Punch-list clearance
- Final inspection
- Packing-list verification
- Dispatch clearance
- Quality dossier preparation
- Client and third-party sign-off
Health, Safety and Environment
LSI is committed to preventing injury, occupational ill health, property damage and environmental harm.
Our HSE approach includes:
- Hazard identification and risk assessment
- Project-specific HSE planning
- Method statements
- Permit-to-work compliance
- Daily toolbox talks
- Competency and training controls
- PPE requirements
- Lifting and rigging controls
- Equipment inspections
- Vehicle inspections
- Work-at-height controls
- Hot-work controls
- Confined-space controls
- Electrical safety
- Emergency preparedness
- Incident and near-miss reporting
- Corrective-action management
- Site inspections
- HSE audits
- Stop-work responsibility
- Waste-management controls
- Spill prevention and response
- Chemical and coating-material controls
- Continual performance improvement
Safety requirements are incorporated into planning, mobilization, execution, supervision and closeout.
View Our CertificationsPlanning an Industrial Work Package?
Send us your drawings, specifications, bill of quantities, project location, required delivery date and inspection requirements. LSI will review your enquiry and provide a practical technical and commercial response.
Tell Us About Your Requirement
Submit your project information and our team will coordinate the appropriate technical and commercial review.
Contact our team
Let Us Discuss
Your Project
5371 Al Dammam–Al Jubail Highway Road
Al Jubail, Kingdom of Saudi Arabia
+966 13 838 3130



